Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the.
Drop ceiling grid installation instructions.
Step 1 design your drop ceiling grid it starts with a game plan.
Three easy steps to install your ceiling 1.
Snap the chalk line tool to create this.
Measure across the diagonals of the 2 x 4 opening.
Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Be sure the suspension wires are securely fastened.
Lift panel at angle through grid.
Determine the size of your border panels from side to side.
Cut the main tees for the drop ceiling hangers.
Use a chalk line or tie strings across your room every 4 ft 1 2 m.
Cut the main runners to fit the length of your room perpendicular to the joists.
The main runners will support the.
Drop into place a.
Check the original sketch of the room to determine this location.
Locate the first suspension wire for each main tee directly above the point where the first cross tee meets the main tee.
Don t assume the wall is straight.
Literally measure and make a to scale drawing of each room.
Secure the end of a chalk line on one end of.
Putting in the grid system 1.
Hanger wire can be suspended for ceiling installation.
Install hanger wire or.
Typical installation tee patterns 2 x 4 grid layout 2 x 4 tee layout 2 x 2 tee layout planning for 2 x 2 ceiling panels.
Screw an eyelet into every.
Slope 1 in 1 8mtr in any plane if more use counter splaying wires step 5.
Install wall molding mark the desired new ceiling height on the wall.
Apply them to the ceiling with screw eyes screw hooks nails or by drilling.
Join sections of main beam.
If the grid is not square shorten one of the main beams until the diagonals are equal.
To allow for ceiling tile installation and accessibility the minimum drop is 3 with traditional hanger wire or 2 5 with quickhang grid hooks.
300mm 45 0 45 0 300mm 1 80mtr.
Install two four foot cross tees between the two main beams in line with the first two border cross tees.
The measurements will be the same if the grid is square.
The cross tee slots must line up.
Then layout your tile spacing and see how it looks.
Suspended ceiling for 2 x 4 ceiling panels.
If you are using 2 x 2 panels you need to lay out your grid differently.
Installation of hangers ceiling soffit duct section threaded rod hanger wire vertical support slotted bar main tee for suspending the ceiling.
Additional 2 cross tees dotted lines are installed parallel to the main tees 2 o c.
Trim border panels cutting panel face side up b.